NUAKH.

Essential Guide to Coastal Permitting in Alabama

Planning a waterfront project in Alabama? Whether you’re constructing a dock, seawall, or a living shoreline, your first step isn’t breaking ground—it’s navigating coastal permits. In Baldwin and Mobile Counties, missing a requirement can mean delays, fines, or demolition orders. This guide covers the agencies, permit types, timelines, and how NUAKH keeps your project compliant from first draft to final approval.

Key Points

  • Applies to the Alabama Coastal Area (Baldwin & Mobile Counties)
  • Agencies: USACE, ADEM, ADCNR (+ local)
  • Permit paths: Nationwide, Regional, or Individual
  • Living shorelines permitted; strong for resilient erosion control

What Coastal Permitting Covers

Coastal permitting covers the state and federal approvals required for development in the Alabama Coastal Area—tidally influenced waters, wetlands, and shorelines. This generally includes all land and water seaward of the 10-foot contour line in Baldwin and Mobile Counties under the Alabama Coastal Area Management Program (ACAMP).

Primary Authorities

  • ADCNR — Policy, shoreline management, and ACAMP implementation
  • ADEM — Administers permits, compliance, and coastal zone reviews
  • USACE — Federal permits for dredge/fill and navigable waters

Most projects use a joint application to ADEM and USACE; local jurisdictions may require additional approvals.

When Permits Are Required

Permits are typically required for construction, alteration, or development affecting coastal lands or waters, including:

  • Dock and pier construction; boat lifts and marine storage
  • Seawalls and bulkheads; shoreline stabilization
  • Living shoreline installation
  • Dredging or filling activities
  • Beachfront residential or commercial buildings
  • Site development > 5 acres; wastewater discharges or large groundwater withdrawal

The Permitting Process

  1. Pre-consultation: confirm jurisdiction and identify red flags with ADEM/USACE
  2. Permit-ready drawings: code-compliant plans aligned with coastal regulations
  3. Joint submission: state + federal review; some projects trigger public comment
  4. Review & coordination: agencies assess impacts and ACAMP consistency; revisions may be requested
  5. Approval & compliance: proceed with construction; inspections/post-install docs as required

Typical timelines: ~45–120+ days depending on complexity, location, and workload.

Documentation Requirements

  • Joint ADEM/USACE application
  • Detailed site plan (dimensions, setbacks), vicinity & aerial maps
  • Mean High Water Line survey; elevation drawings and cross-sections
  • Ownership documentation; environmental information
  • Hydrologic and erosion control plans (as applicable)
  • For living shorelines: planting plan, native species list, oyster reef configuration

Special Focus: Living Shorelines

Living shorelines use natural elements—oyster shell, marsh grass, biodegradable materials—to stabilize banks and restore habitat. They still require full permitting, but often provide a resilient, long-term solution.

How NUAKH Helps with Living Shorelines

  • Engineered plans and cross-sections
  • Sediment and vegetation documentation
  • ACAMP-aligned scope and narratives
  • Complete application package to ADEM and USACE

Common Mistakes to Avoid

  • Submitting incomplete applications → Delays or denials → We prepare and verify a complete package
  • Ignoring local zoning rules → Fines or project shutdown → We coordinate with county and city departments
  • Inaccurate site plans or surveys → Application invalidated → In-house drafters produce permit-ready designs
  • Missing public notice/review deadlines → Permit rejection → We manage timeline and agency communication

Why Work with NUAKH?

NUAKH is more than a drafting service—we’re a compliance partner with deep experience in marine construction planning and shoreline infrastructure. We ensure drawings meet ADEM, ADCNR, and USACE standards, local setbacks and heights are respected, and site constraints are resolved before submission—so you avoid costly revisions and delays.

Conclusion

Navigating Alabama’s coastal permitting requires expertise in multiple agencies and regulations. NUAKH provides the technical drawings, permit applications, and compliance guidance to keep your waterfront project on track.

Ready to start?
Contact us to begin.